-
35,000m2 GFRC coating
-
6,000 m2 of aluminum doors and windows
-
7,000m2 Roofing
-
6,000m2 of insulation
-
25,000m2 of gypsum plaster and painting work
-
2,000 m2 Wooden doors and windows
-
2,000m2 Glass partitions
-
12,000m2 of concrete flooring
-
6,000m2 Ceramic coating
-
3,000m2 of wallpaper covering
-
Hotel complex infrastructure works
-
Transporting 10,000 tons of sand (for beaches)
-
350 tons of steel roof
-
Wooden canopy and pergola applications
-
Glass railing
-
Concrete retaining walls and roads
-
120 pieces of specially designed fireplace


